Translation is not possible.

To calculate the total years required to complete the 440 km undersea tunnel from Gwadar Pakistan to Muscat for bullet train lahore to Jeddah, assuming maximum working quality and 24/7 operation:

*Assumptions:*

1. Two TBMs boring from opposite sides (220 km each)

2. Maximum boring speed: 30 meters/day (optimistic estimate)

3. 24 hours/day operation

4. 365 days/year (continuous operation)

5. No downtime or maintenance breaks

*Calculations:*

- Total tunnel length: 440 km

- Each TBM bores: 220 km

- Days required per TBM: 220 km / 30 m/day ≈ 7,333 days

- Total days (both TBMs): 7,333 days / 2 ≈ 3,667 days

- Years required: 3,667 days / 365 days/year ≈ 10.04 years

*Breakdown:*

- Total working hours: 24 hours/day × 365 days/year × 10.04 years ≈ 87,942 hours

- Total working days: 3,667 days

*Maximum Working Quality Scenario:*

- 10.04 years (approximate)

- 3,667 days

- 87,942 hours

*Contingency Planning:*

Considering potential delays and challenges:

- 12-15 years (realistic estimate)

- 4,380-5,475 days

- 105,120-131,400 hours

Please note that these estimates are optimistic and may vary depending on various factors, including:

- Geotechnical challenges

- Equipment performance

- Weather conditions

- Logistics and supply chain management

Would you like more information on tunnel construction or project management?